Construction Scheduling with Primavera Project Planner, Second Edition

Prentice Hall
$156.00

Attributes

Current Stock:
SKU:
130922013
Weight:
1.80 LBS
Shipping:
Calculated at Checkout
ISBN-10 DIGIT:
0130922013
AUTHOR-1:
Leslie Feigenbaum
COPYRIGHT/PUBLICATION DATE:
2002
BINDING:
Paperback
EDITION NUMBER:
2nd
PAGE COUNT:
340
LAST UPDATE (DATE):
January 30, 2010

Attributes

Current Stock:
SKU:
130922013
Weight:
1.80 LBS
Shipping:
Calculated at Checkout
ISBN-10 DIGIT:
0130922013
AUTHOR-1:
Leslie Feigenbaum
COPYRIGHT/PUBLICATION DATE:
2002
BINDING:
Paperback
EDITION NUMBER:
2nd
PAGE COUNT:
340
LAST UPDATE (DATE):
January 30, 2010

Description

This book covers the latest version of Primavera Project Planner and features the exclusive use of this software as a vehicle for application. The author deftly integrates the scheduling aspects of a construction project with the estimating process as well as the elements of the overall management of the project. Primavera software not included.